Automatic station HELIOS.05 pH/Cl 2хAT.AM2 (8 l/h at 2 bar)
We ship the day after you place your order
Pickup currently not available
HELIOS.05 pH/Cl Automatic Station with 2×AT-AM2 Pumps — Comprehensive Pool Chemistry Control
HELIOS.05 with two AT-AM2 pumps is a completely ready-to-install automatic dosing station for simultaneous control of pH and chlorine in pool water. Built around the NEXUS.7000 multiparameter controller, the station is mounted on a PVC panel measuring 80×60 cm and comes fully assembled with connected wires. Two built-in AT-AM2 peristaltic pumps, each with a capacity of 8 l/h, provide independent dosing of acid for pH correction and disinfectant to maintain chlorine levels.
Package Contents
NEXUS.7000 multiparameter controller, 80×60 cm PVC panel, plexiglass sensor holder with amperometric chlorine sensor, pH and Rx sensors, pH and Rx buffer solutions, brass brush for electrode cleaning, adjustable flow sensor, sampling valve, degassing filter, holders, tubes, and valves.
Specifications
Manufacturer — Injecta (Italy)
Article number — JH05PCCU0000
Pumps — 2 × AT-AM2
Panel dimensions — 600 × 700 × 10 mm
Flow rate at 2 bar — 8 l/h
Max. operating pressure — 5 bar
Voltage — 100–240 Vac, 50/60 Hz
Power — 60 W
Input signal — 240 VAC
Dosing type — peristaltic
pH measurement range — 0.0–14.0
Cl measurement range — 0.0–5.0 mg/l
Inlet/Outlet — 8×12
Weight — 15 kg
Key Advantages
Two independent pumps — simultaneous dosing of two reagents: pH correction and chlorine maintenance.
Ready to install — fully assembled and connected, requires no additional setup.
NEXUS.7000 controller — premium multiparameter controller for precise control.
Amperometric chlorine sensor — accurate Cl measurement with automatic temperature compensation.
Complete set — all sensors, reagents, and consumables are included in the basic kit.
Wide voltage range — compatible with 100–240 V networks.
Frequently Asked Questions
How does this model differ from the HELIOS.05 without a pump?
For pools of what volume is the station with AT-AM2 pumps suitable?
Is additional equipment required to launch the station?